- Phase 7 planning completed with 4 comprehensive plans - All 8 design decisions (D-01 through D-08) addressed - Plans verified and ready for execution - YAML format + Python scripts alignment confirmed - Ready for /gsd-execute-phase 7 Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
3.0 KiB
3.0 KiB
CURRENT AI WORKING SESSION — HANDOVER
Active AI: Claude Haiku 4.5 (Claude Code) Last Updated: 2026-04-23 Current Version: v1.14.6 Status: 🟢 PHASE 7 PLANNED
SESSION 40 EXECUTION — Phase 7 Config Consolidation Planning
Work Completed This Session
1. Phase 7 Planning (Config Consolidation):
- ✅ Executed
/gsd-plan-phase 7 --skip-research - ✅ Replanned Phase 7 from scratch (existing 18-task .env plan was misaligned with CONTEXT decisions)
- ✅ Created 4 new comprehensive plans aligned with YAML + Python decisions:
- Plan 07-01: Create config/ folder structure with YAML files + examples + documentation
- Plan 07-02: Refactor backend config_loader.py for YAML parsing + deprecate inventory.env
- Plan 07-03: Convert 4 bash deployment scripts to Python (deploy.py, run_standalone.py, install_service.py, export_prod.py)
- Plan 07-04: Update Docker/Compose, Dockerfile, .gitignore, documentation
- ✅ All plans verified and passed gsd-plan-checker (17 tasks, 31 files, all decisions covered)
2. Phase 7 Decisions Implemented:
- ✅ D-01: YAML format standardization (backend.yaml, frontend.yaml, network.yaml, docker.yaml)
- ✅ D-02: Secrets management (config/secrets.yaml, git-ignored, .example files)
- ✅ D-03: Example files tracked in git (*.yaml.example)
- ✅ D-04: Complete inventory.env deprecation (no fallback)
- ✅ D-05: Bash → Python script conversion for deployment
- ✅ D-06: Backend config load order: env vars > YAML > defaults
- ✅ D-07: Docker Compose updated for config/ structure
- ✅ D-08: Comprehensive documentation (DEPLOYMENT.md, README.md, config/README.md)
3. Plan Structure:
- Wave 1: Foundation (config/ structure creation)
- Wave 2: Backend refactoring + Python scripts (parallel execution)
- Wave 3: Docker integration + final documentation (depends on Waves 1-2)
Phase 7 Artifact Status
- Plans:
.planning/phases/07-config-consolidation/07-{01,02,03,04}-PLAN.md✓ Created - Context:
.planning/phases/07-config-consolidation/07-CONTEXT.md✓ Exists (locked decisions) - Verification: All 4 plans passed gsd-plan-checker ✓
NEXT STEPS
-
Execute Phase 7:
/gsd-execute-phase 7- Wave 1: Create config/ folder with YAML files and examples
- Wave 2 (parallel): Refactor backend config loader + create Python deployment scripts
- Wave 3: Update Docker, documentation, and .gitignore
-
After Phase 7 Completion:
- All configuration consolidated in config/ folder (YAML format)
- inventory.env deprecated and removed
- Deployment scripts converted to Python
- Docker and standalone deployments fully working with new structure
- Comprehensive documentation in place
-
Future Phases:
- Phase 8+ (as defined in ROADMAP)
- Consider advanced config features (hot-reload, KMS encryption, config versioning) for future phases
✓ Phase 7 planned and ready for execution.