Files
tfm_ainventory/.planning/STATE.md

2.8 KiB

Planning State — TFM aInventory V2 Reset

Date: 2026-04-22
Reset Type: Lost priority focus / refocus on v2
Scope Preserved: Mission, tech stack, validated features, constraints


What Changed

Why Reset Was Needed

  • Current phase (3) complete; unclear what v2 should prioritize
  • Too many potential features; no clear direction
  • Field deployments active but feedback not systematized

What We Kept

✓ Core mission: inventory + scanning + AI extraction + offline sync
✓ Tech stack: FastAPI, SQLite, Next.js (no changes planned)
✓ v1.14.6 work: Image adjustment modal, rotation-only simplification, zoom fix
✓ Constraints: LDAP auth, offline-first, multi-AI support

What We Added

  • Clear v2 feature scope (must-have, should-have, nice-to-have)
  • Field validation phase (phase 4) before feature development
  • Structured roadmap: Phases 4-7 with milestones
  • Success criteria for each phase

Current State

Version: v1.14.6 stable
Branch: dev
Last Work: Session 33 (ImageAdjustmentModal rotation-only, zoom fixes)
Deployments: 1-2 pilot sites using v1.14.6


Next Steps

  1. Phase 4 Planning (/gsd-plan-phase 4):

    • Deploy v1.14.6 to pilot sites
    • Collect field feedback
    • Fix mobile UX blockers
    • Update deployment docs
  2. Phase 5 Planning (after field validation):

    • Implement batch operations
    • Add search/filtering
    • Add export/reports
    • Based on field user feedback
  3. Ongoing:

    • Monitor field deployments
    • Track issues/feedback
    • Adjust roadmap based on real user needs

Key Assumptions

  • Field users are actively using v1.14.6
  • LDAP + offline-first are non-negotiable requirements
  • SQLite is sufficient for v2 scope
  • AI providers (Gemini + Claude) remain stable and affordable
  • No multi-tenant or multi-warehouse needs in v2

Decision Log

Date Decision Rationale Status
2026-04-22 Reset planning to phases 4-7 Lost focus on v2 direction; field feedback needed Active
2026-04-22 Phase 4: Field validation first Gather real user needs before building v2 features Planned
2026-04-22 Defer cropping, analytics, federation Not needed for v2; revisit in v3 Out of scope

Risk Register

Risk Impact Mitigation
Field users have different priorities than assumed High Phase 4 validation; adjust roadmap based on feedback
SQLite hits scale limits with 10K+ items Medium Phase 6 scale testing; optimize queries if needed
AI provider costs become prohibitive Medium Monitor usage; have fallback provider (Claude if Gemini fails)
LDAP integration blocks new deployments Medium Phase 4 docs; simplify setup; provide troubleshooting guide

Last updated: 2026-04-22 after reset