Commit Graph

17 Commits

Author SHA1 Message Date
be3555d7cd docs(phase-6): add dual-deployment requirement - docker and standalone modes
- Both Docker and start_server.sh standalone modes required
- Shared config files between both modes (no duplication)
- Single config source of truth (inventory.env)
- Both modes available for development and production use
2026-04-22 18:21:12 +03:00
4e6f940b75 refactor(phase-6): remove scale testing plan, simplify to docker + runbook
- Delete PLAN-02-SCALE-TESTING.md (scale testing deferred to v3)
- Rename PLAN-03-BACKUP-RUNBOOK to PLAN-02-OPERATIONAL-RUNBOOK
- Phase 6 now has 2 executable plans instead of 3
2026-04-22 18:18:00 +03:00
4ea9625928 docs(phase-6): revise context - single-instance deployment, Docker only, no scale testing
- Lock decision: Single-instance Docker deployment (not multi-site)
- Remove scale testing from Phase 6 scope (defer to v3)
- Simplify to 2 plans: Docker deployment + operational runbook
- Update success criteria to focus on reliability, not performance testing
2026-04-22 18:17:45 +03:00
4b7621fcd1 feat(6): phase 6 planning complete - deployment, scale testing, backup/restore
Phase 6 comprehensive plans ready for execution:

Plan 1: Docker Containerization & Deployment Automation (6 tasks)
- Enhance backend/frontend Dockerfiles with health checks
- Create deploy.sh for single-command deployment
- Environment automation and validation
- Quick start guide and troubleshooting docs

Plan 2: Scale Testing & Performance Optimization (6 tasks)
- Locust-based load testing framework (5 concurrent users)
- Database seeding (10K items with realistic data)
- Metrics collection (CPU, memory, response times)
- Performance baseline establishment and SLO documentation
- Health check monitoring automation
- Load test execution guide

Plan 3: Backup/Restore & Operational Runbook (7 tasks)
- Automated backup script (daily/weekly with retention)
- Restore validation and disaster recovery procedures
- Cron job configuration for scheduled backups
- Comprehensive operational runbook (deployment, scaling, troubleshooting)
- Health monitoring checklist (daily/weekly/monthly)
- Disaster recovery plan (3+ scenarios, <10min RTO)
- Operations documentation index and integration guide

Context document summarizes:
- Phase goal: Production-ready multi-site deployment
- Key decisions: Docker strategy, automation scope, scale limits
- Upstream dependencies: Phase 5 complete
- Success criteria: Single-command deploy, 10K items + 5 users <2s latency
- Backup strategy: Daily incremental, weekly full (30/90 day retention)

All plans include:
- Detailed task breakdowns (5-7 per plan)
- Acceptance criteria and testing procedures
- Dependencies and blockers
- Effort estimates and risk assessment
- Success metrics and monitoring guidance

Ready for execution phase (estimated 4-5 weeks total).
2026-04-22 18:13:35 +03:00
d0c0f8a84c docs(phase-5): verification review - all blocking issues resolved, ready to merge 2026-04-22 18:09:18 +03:00
43094c42d1 docs(phase-5): code review fixes complete - auth headers and validation 2026-04-22 18:05:24 +03:00
62475ae0af docs(phase-5): code review complete 2026-04-22 18:02:33 +03:00
a68d1bd23d docs(5-plan-02): add summary - all 6 tasks completed, full test coverage 2026-04-22 17:44:55 +03:00
7f3ed6c666 docs(5.1): complete Phase 5 Plan 01 execution summary and session handover
- Created 5-PLAN-01-SUMMARY.md with full implementation report
- Updated SESSION_STATE.md with Session 38 completion details
- Phase 5 Plan 01 status: COMPLETED (5/5 tasks, all tests written)
- Ready for inventory page integration and Phase 5 Plan 02 execution
2026-04-22 17:43:02 +03:00
ae3ca2cbee feat(5): phase 5 planning complete - 3 plans, 18 tasks covering quick adjust, search, exports 2026-04-22 17:36:36 +03:00
6471f6c86f docs(5): phase 5 context finalized - quick quantity adjust, search, exports locked 2026-04-22 17:33:44 +03:00
965c7631b2 docs(4.1): phase 4.1 UAT complete - all 14 tests pass, ready for next phase 2026-04-22 17:02:36 +03:00
b0d93e8be8 docs(4.1): wave 3 execution complete - frontend components for search integration 2026-04-22 16:47:24 +03:00
42efe54265 docs(4.1): wave 2 execution complete - web scraping and spec extraction backend services 2026-04-22 16:38:21 +03:00
5ba488ea5e docs(4.1): wave 1 execution complete - spare-parts classification foundation 2026-04-22 16:36:11 +03:00
ac87c4c06b docs(4.1): planning complete - research + 3 executable plans
Phase 4.1: AI Prompt Enhancement — Spare Parts Deep Identification

Artifacts:
- 4.1-RESEARCH.md: Web scraping patterns, spare-parts classification, integration architecture
- 4.1-PLAN-01.md (Wave 1): Spare-parts whitelist + AI prompt enhancement (4 tasks)
- 4.1-PLAN-02.md (Wave 2): Web scraping service + backend integration (6 tasks)
- 4.1-PLAN-03.md (Wave 3): Frontend integration + end-to-end testing (7 tasks)

All 17 tasks verified:
✓ Concrete action steps with exact function signatures and file paths
✓ 100% verifiable acceptance criteria (grep, pytest, vitest, imports)
✓ Architecture aligned with all 11 CONTEXT.md decisions
✓ CLAUDE.md compliance: TypeScript strict, API tests, UI fidelity
✓ Wave dependencies correctly ordered
✓ Risk mitigation: rate limiting, timeout handling, offline graceful degradation

Ready for execution via /gsd-execute-phase 4.1
2026-04-22 16:28:26 +03:00
b90085cce5 docs(4.1): capture phase context and discussion log for AI spare parts deep identification
- AI Prompt: Detailed categorization to distinguish spare parts from consumables
- Search: Web scraping (requests + BeautifulSoup) to extract Google results, no API key
- Trigger: Automatic background search after AI extraction if category matches whitelist
- UX: Block until search completes, user reviews and edits all fields before save
- Mapping: Extract product type/specs/manufacturer/description to Notes field
- Retry on failure, user can skip if needed
2026-04-22 16:16:51 +03:00